Greg gave me the idea of replacing the Water Wizard sticker set on the unit, which they do look pretty bad. Jim Coleman wants $500 for the American Flag version of the wizard sticker. I am going to see how much a local vinyl guy will cost first though.
Water Wizard Preparation – Electrical work
Water Wizard Preparation – Entry unit trench
Water Wizard Preparation – Entry unit trench
(See if you can figure out when my Canon camera broke and I had to start using my iphone.)
Today, I started my entry unit trench. I cut the blacktop out and dug up 4 feet of the 12 feet that needs to be dug up. (The pay station will be installed 15 feet from the rails? Or at least that is where I am planning to install mine for now.)
Water Wizard Preparation – Concrete footer
Water Wizard Preparation – Inspector and Concrete footer
The Electrical inspector inspected my equipment room today and almost had me put my power box outside. Luckily I can put it on an adjacent wall.
I also waited around to take some pictures of the concrete being poured for about 3 hours, then gave up. So I hope the footer looks good but there will be no pictures today.