Water Wizard Preparation – Bay work

DSC00197.JPGDSC00200.JPG

William and I installed the eyes, rails and treadle.

DSC00202.JPGDSC00201.JPGDSC00216.JPGDSC00215.JPG

We also installed the hoses and power through the boom.  According to our local rep I have the old style boom and it is not very desirable.  I think a new one cost around $3,000?

DSC00206.JPGDSC00218.JPG

We also installed the entry gate.

Water Wizard Preparation – Entry unit trench

IMG_8801.JPGIMG_8802.JPGIMG_8803.JPGIMG_8804a.JPGIMG_8804b.JPG

(See if you can figure out when my Canon camera broke and I had to start using my iphone.)

Today, I started my entry unit trench. I cut the blacktop out and dug up 4 feet of the 12 feet that needs to be dug up.  (The pay station will be installed 15 feet from the rails?  Or at least that is where I am planning to install mine for now.)