Water Wizard Preparation – Install day – Rail install

IMG_8088.JPGIMG_8089.JPGIMG_8091.JPG

The first picture is Mike (from Premier Car Wash Systems) and Williams marking off before setting the rails.  The second picture shows the transit level that I rented from Alabama Rental for around $25 and the third picture shows my awesome laser level Mike used to level off the first rail.

IMG_8093.JPGIMG_8096.JPGIMG_8097.JPG

Then, after all the setup, there was a lot of drilling (first picture) and a lot of measuring with a large stick (second picture).  Then we were done (third picture) which took around 2 1/2 to 3 hours.