I clamped down the rail heat low pressure hoses that are in the automatic bay today. I could not clamp down the high pressure undercarriage today because I needed some washers.
Water Wizard Preparation – Low Pressure hose install
Lengthened all the hoses to the Water Wizard unit today. We still have the rail heat, air line and high pressure hoses to go. Then I need to connect the soft water, city water, ro water, check the electrical, make sure the phone line works (which it does not), and get service for accepting credit cards. I also need the final building inspection. Also, in general, just see if the equipment still works after being transported and stored for such a long time.
As for the phone line I called yesterday about the line and they said it worked. So I plugged a phone into the phone box attached to the building and I did not get a dial tone. I assume this should work? But the person I was talking to could not answer this technical question. I did learn this though: when calling the phone company, “you should know your phone number”. I guess everyone gives me a hard time?