Posted on March 3, 2009January 18, 2024Water Wizard Preparation – Electrical work The electrician worked on conduit and running wire today.
Posted on February 25, 2009January 18, 2024Water Wizard Preparation – Electrical work The electricians mounted the rail heater and installed the 3 phase to it. He also connected power to the Water Wizard control unit.
Posted on February 23, 2009January 18, 2024Water Wizard Preparation – Electrical work The Electrician cut my power off today and installed a new meter box and 2 new panels. We also mounted the Water Wizard – Electrical control center on the wall. If all goes according to plan I should have power late tomorrow after the inspection.