Pictures of the poured concrete footer. It looks pretty good I guess: looks a little rough on the one side. Now I can install the Water Wizard guide rails and entry arch.
Water Wizard Preparation – Inspector and Concrete footer
The Electrical inspector inspected my equipment room today and almost had me put my power box outside. Luckily I can put it on an adjacent wall.
I also waited around to take some pictures of the concrete being poured for about 3 hours, then gave up. So I hope the footer looks good but there will be no pictures today.