This is a picture of the wax, soap and hot water lines. Also, a picture of the pump stand before the pvc removal.
I installed half inch elbows for the hot and cold water lines. Then I mounted the solenoid rack on the pump stand frame. Everything worked great. I will need to convert the last pump stand tomorrow. Also, move the electrical and run the cold water lines.